ANALISA CYCLE TIME YANG DAPAT DI REDUCE DENGAN ADANYA RANCANG BANGUN MESIN CUTTING TOPPING SUDARE PADA DEPARTEMEM LONG SIZE DI PT XYZ
Keywords:
Improvement, Production, Time study, Cycle timeAbstract
This article explains the need for time study analysis
that can be reduced by the design of a sudare topping
cutting machine. The working principle of the cutting
machine is based on an automatic machine working
system. Control circuits use input components such as
sensors, push buttons, emergency buttons, selector
switches and footswitches. On the other hand, three
phase motors, pneumatic cylinders and thermal relays
are used for the output components. This machine is
used to reduce the number of cycle times in the bonding
process. This machine reduced cycle times from 29
minutes 29 seconds to 19 minutes 46 seconds, giving a
cycle time of 27 minutes 30 seconds..
Downloads
Published
03-02-2025
Issue
Section
Artikel